For Concrete Contractors

Construction software for concrete contractors

A pour day does not move for paperwork. PILOTA puts the crew, the weather, the pre-pour check and the pump on the record, then gets out of the way.

A concrete crew screeding a fresh slab
PILOTA iOS daily report form for 26-104 Riverside Medical Office with auto-loaded weather, Work Performed being dictated, and the crew list.

PILOTA for Concrete Contractors

PILOTA for concrete contractors is field software for flatwork, foundation and structural concrete crews. It schedules crews to pour days, pulls the weather onto every daily report, runs your pre-pour checklist and tracks pumps, tools and rentals by project. PILOTA does not do estimating, mix designs or concrete test tracking.

What slows concrete contractors down

Disputed delay days

Weather delays with no record

You lost two days to rain, but the GC says the schedule slipped on you. Without a dated record of conditions and hours lost, it is your word against theirs.

A load sent back, a crew standing

Pour day surprises

Forms, rebar or embeds were not checked before the trucks were called, and the crew stands around while it gets fixed.

Training you cannot prove

Silica on every cut

Sawcutting and grinding put silica in the air. If the crew's talks and training are not written down, you cannot show they happened.

The PILOTA features concrete contractors use most

A pour week in PILOTA

Crew on the pour day

Schedule the finishers to the project and date with the start time. They get a push notification.

Pre-pour check

The foreman runs the pre-pour checklist with photos. A failed item gets a note and is fixed before the trucks are called.

Pour and report

The crew is clocked in together. The daily report carries the weather, crew, deliveries, equipment hours and photos.

Weather day

Rain stops the pour. The delay is logged with its category and hours lost on that day's report, ready if the schedule is questioned.

Questions from concrete contractors

PILOTA fits concrete contractors who need crew scheduling, daily reports with weather and delays, pre-pour checklists, equipment and rental tracking and crew time. It does not do estimating, takeoff, mix designs or concrete test tracking.

Yes. The Ground plan is $79 a month for up to 5 users with unlimited projects, and a foreman can clock in the whole crew from one phone.

Yes. When you pick the project, PILOTA pulls the day's conditions, temperature and wind for the job's location onto the daily report. Delays are logged with a category and hours lost.

No. OSHA's construction silica standard requires a written exposure control plan, and PILOTA does not create it. You can store the plan under Plans & Documents and record silica toolbox talks with attendees in PILOTA.

No. PILOTA has no concrete test or lab result tracking. You can attach test reports to the project as documents or note them on the daily report.

PILOTA for other teams

Ready to pilot your project?

Start your 14-day free trial. Your team can be up and running the same day.

Get started