Construction time tracking: how to track crew hours by job

Construction time tracking is recording each worker's hours by day, project and cost code, so payroll is accurate and labor cost lands on the right job. A good system captures start and end times and breaks as they happen, ties each entry to a job, flags anything unusual, and gets a supervisor's approval before payroll. Timesheets filled in from memory at the end of the week invite errors.

Updated 2026-11-17

Why time tracking matters more in construction

Construction crews move between jobs, start at the site rather than an office, and often work long or uneven weeks. Every one of those makes time harder to track and mistakes more expensive. An hour on the wrong job makes one job look better and another look worse; a missed break or a rounded clock-in changes payroll.

Time data does three jobs at once. It pays people correctly, it puts labor cost on the right project and cost code for job costing, and it shows what actually happened on site when a client questions a bill or a schedule.

What the law requires: records and overtime

For nonexempt employees, the federal Fair Labor Standards Act sets the baseline. The U.S. Department of Labor's recordkeeping fact sheet lists what employers must keep, including the day and time the workweek begins, hours worked each day, total hours each workweek, the regular hourly rate, straight-time and overtime earnings, and total wages paid each pay period. Payroll records must be kept for at least three years; records used to compute wages, such as time cards, for two years.

State rules can add to this, and so can your contracts. On federal and federally assisted construction covered by Davis-Bacon, contractors and subcontractors submit certified payroll weekly; the Department of Labor publishes form WH-347 as an optional form for it. Check your state labor department and your contract before you design your timesheet.

Under the FLSA, nonexempt workers must be paid at least time and one half their regular rate for hours over 40 in a workweek. The workweek is a fixed, recurring period of 168 hours, seven consecutive 24-hour periods, and it can start on any day; hours cannot be averaged across two weeks. Federal law does not require overtime just because work falls on a weekend or a holiday.

Some states go further. California, for example, requires time and one half for hours over 8 in a workday and double time for hours over 12 in a workday. If you work in more than one state, your time system needs to apply the right rule to each worker.

What every construction timesheet needs

Whatever tool you use, every time entry should answer the same questions: who, when, where and on what. These are the fields that make an entry usable for payroll and for job costing.

GPS clock-in and geofences

Mobile time clocks that record location at clock-in and clock-out answer the question "was this person on site?" without a phone call. A geofence, a radius drawn around the jobsite, can flag punches made somewhere else for a manager to review.

Use location data as a flag, not an automatic rejection. Phones lose signal, workers start at the yard, and a foreman may clock in a crew from the gate. Tell workers what is tracked and when, check whether your state has rules about employee location tracking, and only record location at punches rather than all day if that is all you need.

Crew punches, kiosks and shared devices

Not every worker has a smartphone on site, and not every company wants them using one. Two common setups solve this. A foreman can clock the whole crew in and out from one device, which is fast but puts the foreman's accuracy behind every entry. Or a shared tablet at the trailer works as a kiosk where each worker punches in for themselves.

Either way, keep the record honest. Crew punches should record that the foreman entered them, and should not treat the foreman's phone location as every worker's location. Kiosk punches should identify the worker, not just the device. When a worker forgets to punch, record the correction as a correction, with who made it and why, rather than overwriting the original.

Approvals and the weekly routine

Errors are cheapest to fix the same week. Have supervisors review and approve their crew's time every day or at least before the end of each pay period. Look for missed punches, entries on the wrong job, unusually long shifts, breaks not taken, and anything flagged off site.

Once time is approved, lock it and export it to payroll. Edits after approval should be rare, recorded, and made by someone with permission to make them.

Common time tracking problems and how to fix them

The same few errors account for most payroll corrections and miscoded labor. Each one has a simple fix if it is caught in the same week.

Weekly construction timesheet template

Worker nameAs it appears on payroll.
Trade or roleUsed for rates and certified payroll classifications.
Workweek startThe day and time your workweek begins.
DateOne row per day per project.
ProjectName and number.
Cost codeFrom the company cost code list.
Clock in and clock outActual times.
BreaksStart and end, and whether paid or unpaid.
Daily hoursNet of unpaid breaks.
Weekly total and overtime hoursUsing the federal and state rules that apply.
NotesTravel, shop time, missed punch explanation.
Worker signatureConfirms the hours.
Supervisor approvalName, signature and date.

How PILOTA handles this

The PILOTA GPS time clock lets crews clock in and out from the iOS app, the Android app or the web portal, picking the project and an optional cost code, and records location when the device has a fix. A project geofence flags clock-ins outside its radius as Off site for review without blocking them, a foreman can clock in a whole crew, and breaks are tracked inside the shift. Managers approve or reject entries, and the Labor report splits hours over 8 in a day and over 40 in a week and exports to CSV or PDF.

Frequently asked questions

Under the federal FLSA, employers keep each nonexempt worker's hours worked each day and each workweek, the regular rate, straight-time and overtime earnings, total wages and pay dates, among other items. Payroll records are kept at least three years and time cards two years.

Under federal law, nonexempt workers get at least time and one half for hours over 40 in a workweek. Some states, such as California, also require overtime for hours over 8 in a workday.

Rules on employee location tracking vary by state. If you record location at clock-in and clock-out, tell workers what is recorded and check your state's requirements before turning it on.

Certified payroll is the weekly payroll report that contractors and subcontractors on federal or federally assisted construction covered by Davis-Bacon must submit. The Department of Labor's optional form for it is WH-347.

Yes, if you job cost. Tracking hours by project and cost code shows which parts of a job are using more labor than budgeted while there is still time to act.